Beta
What's New
  • Andhra Pradesh (PRRD) is now LIVE on Right of Way since 9th Dec 2025.
  • Andhra Pradesh (TR&B) is now LIVE on Right of Way since 4th Dec 2025
  • Chhattisgarh (PWD) is now LIVE on Right of Way since 4th Dec 2025
  • If the applicant(s) authorised by their units to submit applications under Bharatnet Project are not able to see the Bharatnet option while submitting the application, then they may kindly write to "abpimplementation@gmail.com".
  • Telangana (R&B) is now LIVE on Right of Way since 13th Oct 2025
DOT Mitra

S. No. Category Issued By Services Title Download Published Date
121 Notifications Central Standards » MTCTE Revision of labeling Guidelines in MTCTE Procedure 6.51 MB 22/05/2023
122 Notifications Central Standards » MTCTE Exemption pertaining to ADSLx and VDSLx Interfaces under MTCTE 2.07 MB 22/05/2023
123 Presentations Central Industries Services » Right of Way Related Review Meeting With Secretary(T) On 19 May 2023 On Digital Infrastructure Deployment View URL 19/05/2023
124 Notifications Central Standards » MTCTE Exemption pertaining o parameters of Session Border Controller under MTCTE 1.18 MB 04/05/2023
125 Notifications Central Standards » MTCTE Exemption pertaining to various parameters of Mobile Radio Trunking System under MTCTE 4.05 MB 27/04/2023
126 Circulars Central Annual Capacity Building Report of DoT 2.64 MB 21/04/2023
127 Notifications Central Standards » MTCTE Criteria for certification for Routers and LAN Switches and DWDM equipment having specialized test requirements under MTCTE 1.19 MB 18/04/2023
128 Notifications Central Standards » MTCTE Criteria for certification of Telecom Equipment having specialized test requirements under MTCTE 1.29 MB 18/04/2023
129 Circulars Central Industries Services » Unified License (UL) UL Application Processing fee Amendment 951 KB 18/04/2023
130 Notifications Central Standards » MTCTE Classification of Family and Associated Models of Optical Fibre Cable under MTCTE 2.09 MB 13/04/2023
131 Notifications Central Standards » MTCTE Exemption pertaining to parameters of Precision Timing Protocol Grand Master Equipment and VHF UHF Radio System Equipment under MTCTE 2.58 MB 03/04/2023
132 Notifications Central General Non-applicability of test parameters pertaining to IP Multimedia Conferencing Equipment and LAN Switch and IoT Gateway ER-reg 3.39 MB 29/03/2023
133 Notifications Central General Revamped SARAS Helpdesk 452.46 KB 27/03/2023
134 Notifications Central Standards » MTCTE MTCTE procedure (ver 2.1/ Rel. May 2021) with amendment dated 19.12.2022 and 23.03.2023 1.63 MB 23/03/2023
135 Notifications Central Standards » MTCTE Exemption pertaining to parameters of Optical Fibre (Single Mode) and Optical Fibre Cable under MTCTE-reg 2.19 MB 10/03/2023